Before you sign a ceiling or interior package, run through this checklist. It will save programme pain later.
- Asbestos survey — legacy tiles and coatings must be ruled out or managed before strip-out.
- Height and services — confirm void depth for HVAC, cable trays, and sprinklers.
- Lighting — agree layouts with lux levels, not just tile centres.
- Access — working hours, lifts, and protection to occupied areas.
- Interfaces — who owns bulkheads, fire stopping, and decorators’ prep?
- Handover — tile codes, hatch locations, and maintenance guidance.
We offer free surveys across the North East and Yorkshire and produce clear quotations with scope boundaries — so there are no grey areas on site.